Böker Magnum Long Lead EDC 01SC080 gentleman's knife
()
Article number BO01SC080
Böker Magnum Long Lead EDC 01SC080 gentleman's knife
()
£29.99
In stock
Order before 5:30 PM & get same day shipping
All prices include VAT, fees and charges
Fixed shipping rate of £9.95 for all orders
We ship from the Netherlands
Our customers give us a 4.7/5
Full description
Pros and cons
- ProG10 handle keeps its grip, even with wet hands
- ProLight for a knife of this size
- ProStainless steel that needs little maintenance
- ProLifetime warranty against material and manufacturing defects
- ProAdd an engraving for a personal touch
- ConNo lock, so best for simple cutting tasks
Specifications
8 cm
78 g
Material handle
G10
Type of steel
8Cr13MoV
Specifications
Dimensions & weight
8 cm
2.7 mm
Closed length
10.4 cm
Total length
18.4 cm
78 g
Material
Material handle
G10
Type of steel
8Cr13MoV
57 HRC
G10
8Cr13MoV
Features & functions
Finish blade
satin
Right or left-handed
symmetrical
Blade shape
drop point
plain edge
No
Tools
knife
Opening system
nail nick
Type
everyday carry, gentleman’s knife
Pocket clip
yes, tip-down (right)
Pocket clip position
tip-down
Pocket clip side
right
slipjoint
Can be opened with one hand
No
flat, Secondary V-edge
Number of tools
1
Scope of delivery
Pouch
No
Sheath
No
Böker Magnum Long Lead EDC 01SC080 gentleman's knife
£29.99